WOW....... well today has seen some dramatic changes around the house...well we think so anyway!!!
The Caesarstone benchtops were installed....YEAH!!!!
OMG!!!!
How i am so glad we selected the Nova Aurora with the sparkles...it is just DIVINE!!!!!!!!!!!!!!!!!!!!!!!!!!!
I am soooooo happy!!!!
Plus we upgraded to 40mm benchtops so it looks even better!!!!!!!
We would have regretted it if we had got 20mm and would have always thought "we should have"......so in the end i'm glad we did upgrade....It looks so much better in our kitchen!!!!The bathroom and ensuite are Ice Snow and also look great.
Can't wait to see it with the chrome taps and white basins.....
Can't wait to see it with the chrome taps and white basins.....
The Robe inserts were completed:
Also we had out ducted heating vents installed throughout the house.....
The electrician was on-site as the downlights are all in, the power points, light switches, junction boxes etc are also installed but still a bit more work to do there...so a return visit req'd.
AND....we had out gas meter installed today too....
Hows that for a productive day on-site!!!!!
Tilers were not on-site today - probably because the Caesarstone had to be in first for them to complete their tasks.
But still very happy. Although we're still being told a June handover....we're hoping that they will exceed our expectations....
OMG.....that's next month!!!!!!
So far the progress has been excellent!!!
No comments:
Post a Comment