Wednesday, May 14, 2008

Update from Wed 7th May

The tilers were back on-site today. The spa and bath are now done and the tiling looks pretty good.

I'm not sure what else is planned for this week on-site, i think it was the insulation perhaps???


Here's some pics of the spa in the ensuite:






And here's a better look at our WIR, still some more rails to be installed.




There are 3 sections to each side. We're organising some drawer inserts etc and extra shelving for shoes etc ourselves and we're going to be ordering that shortly. Ian wants to get right into it after handover....

No comments: